Planning Committee - Wednesday 10 January 2024, 2:00pm - Flintshire County Council Webcasts
Planning Committee
Wednesday, 10th January 2024 at 2:00pm
Agenda
Slides
Transcript
Map
Resources
Forums
Speakers
Please let us know your experience of our webcast
Votes
Agenda item :
Start of webcast
Share this agenda point
Agenda item :
2 Declarations of Interest
Share this agenda point
Agenda item :
3 Late Observations
Share this agenda point
Agenda item :
4 Minutes
Share this agenda point
Agenda item :
5 Items to be deferred
Share this agenda point
Agenda item :
6 Reports of Chief Officer (Planning, Environment & Economy)
Share this agenda point
Agenda item :
6 a) FUL/000246/23 - A - Full application - Retention and use of existing structures, plant and ancillary development (including access roadway and landscaping) forming the Point of Ayr gas terminal for the transport of CO2 and the demolition/removal of redundant structures at the terminal; construction and use of new infrastructure required for CO2 service at the Point of Ayr gas terminal; retention and use of the existing 20 diameter gas pipeline, condensate pipes and associated cables from the Point of Ayr gas terminal to the Mean Low Water Spring mark for the transport of CO2 and associated activities; removal of the Shut Down Valve compound associated with the existing 20 diameter gas pipeline from the Point of Ayr gas terminal to the Mean Low Water Spring mark and appropriate restoration/remediation; construction and use of two 33kV electricity and fibre optic connections from Point of Ayr gas terminal to the Mean Low Water Spring mark; and construction and use of two kiosks and assoc
Share this agenda point
- FUL/000246/23 - Full application - Retention and use of existing structures, plant and ancillary development (including access roadway and landscaping) forming the Point of Ayr gas terminal for the transport of carbon dioxide and t
- Enc. 1 for FUL/000246/23 - Full application - Full application - Retention and use of existing structures, plant and ancillary development (including access roadway and landscaping) forming the Point of Ayr gas terminal for the transport of carbon di
Agenda item :
6 a) FUL/000246/23 - A - Full application - Retention and use of existing structures, plant and ancillary development (including access roadway and landscaping) forming the Point of Ayr gas terminal for the transport of CO2 and the demolition/removal of redundant structures at the terminal; construction and use of new infrastructure required for CO2 service at the Point of Ayr gas terminal; retention and use of the existing 20 diameter gas pipeline, condensate pipes and associated cables from the Point of Ayr gas terminal to the Mean Low Water Spring mark for the transport of CO2 and associated activities; removal of the Shut Down Valve compound associated with the existing 20 diameter gas pipeline from the Point of Ayr gas terminal to the Mean Low Water Spring mark and appropriate restoration/remediation; construction and use of two 33kV electricity and fibre optic connections from Point of Ayr gas terminal to the Mean Low Water Spring mark; and construction and use of two kiosks and assoc
Share this agenda point
- FUL/000246/23 - Full application - Retention and use of existing structures, plant and ancillary development (including access roadway and landscaping) forming the Point of Ayr gas terminal for the transport of carbon dioxide and t
- Enc. 1 for FUL/000246/23 - Full application - Full application - Retention and use of existing structures, plant and ancillary development (including access roadway and landscaping) forming the Point of Ayr gas terminal for the transport of carbon di
Agenda item :
6.1 FUL-246-23 - Photographs
Share this agenda point
Agenda item :
6 b) FUL/000633/23 - A - Full application - Construction and operation of the three Block Valve Stations (BVS) in connection with the with HyNet Carbon Dioxide Pipeline proposal at Land adjacent to Cornist Lane, Flint, Pentre Halkyn & Babell
Share this agenda point
- FUL/000633/23 - Full application - Construction and operation of the three Block Valve Stations (BVS) in connection with the with HyNet Carbon Dioxide Pipeline proposal at Land adjacent to Cornist Lane, Flint, Pentre Halkyn & Babell
- Enc. 1 for FUL/000633/23 - Full application - Construction and operation of the three Block Valve Stations (BVS) in connection with the with HyNet Carbon Dioxide Pipeline proposal at Land adjacent to Cornist Lane, Flint, Pentre Halkyn & Babell
- Enc. 2 for FUL/000633/23 - Full application - Construction and operation of the three Block Valve Stations (BVS) in connection with the with HyNet Carbon Dioxide Pipeline proposal at Land adjacent to Cornist Lane, Flint, Pentre Halkyn & Babell
- Enc. 3 for FUL/000633/23 - Full application - Construction and operation of the three Block Valve Stations (BVS) in connection with the with HyNet Carbon Dioxide Pipeline proposal at Land adjacent to Cornist Lane, Flint, Pentre Halkyn & Babell
- Planning 13.12.23 - minutes - final, opens in new tab
- FUL/000246/23 - Full application - Retention and use of existing structures, plant and ancillary development (including access roadway and landscaping) forming the Point of Ayr gas terminal for the transport of carbon dioxide and t, opens in new tab
- Enc. 1 for FUL/000246/23 - Full application - Full application - Retention and use of existing structures, plant and ancillary development (including access roadway and landscaping) forming the Point of Ayr gas terminal for the transport of carbon di, opens in new tab
- 6.1 FUL-246-23 - Reduced size pics, opens in new tab
- FUL/000633/23 - Full application - Construction and operation of the three Block Valve Stations (BVS) in connection with the with HyNet Carbon Dioxide Pipeline proposal at Land adjacent to Cornist Lane, Flint, Pentre Halkyn & Babell, opens in new tab
- Enc. 1 for FUL/000633/23 - Full application - Construction and operation of the three Block Valve Stations (BVS) in connection with the with HyNet Carbon Dioxide Pipeline proposal at Land adjacent to Cornist Lane, Flint, Pentre Halkyn & Babell, opens in new tab
- Enc. 2 for FUL/000633/23 - Full application - Construction and operation of the three Block Valve Stations (BVS) in connection with the with HyNet Carbon Dioxide Pipeline proposal at Land adjacent to Cornist Lane, Flint, Pentre Halkyn & Babell, opens in new tab
- Enc. 3 for FUL/000633/23 - Full application - Construction and operation of the three Block Valve Stations (BVS) in connection with the with HyNet Carbon Dioxide Pipeline proposal at Land adjacent to Cornist Lane, Flint, Pentre Halkyn & Babell, opens in new tab
- 6.2 FUL-633-23 Photographs - Flint - Pentre Halkyn - Babell, opens in new tab